The DuPont schedule is a four-week rotating shift pattern that runs 12-hour shifts, covers a 24/7 operation with four crews, and is built around one defining feature that no other common rotation offers: one full week off every four weeks. It was developed internally at the DuPont chemical company in the 1950s and has since spread across manufacturing, chemical processing, utilities, paper mills, and other continuous-operation industries.

If you've just been told your plant or facility is switching to DuPont, or you're trying to figure out what your paycheck will actually look like across the rotation, this guide covers the full 28-day cycle, week-by-week overtime breakdown, and a real pay calculation for a $32/hr utility worker.

The 28-day DuPont rotation — how it works

The DuPont schedule uses four crews (typically A, B, C, D) and alternates between day and night shifts across a 28-day cycle. The rotation for a single crew looks like this:

WeekShift TypePatternHours
Week 1Day shifts4 on, 3 off48 hrs
Week 2Day shifts3 on, 1 off, 3 on72 hrs
Week 3Night shifts3 off, 4 on48 hrs
Week 4Night shifts / Off3 on, 7 off36 hrs then off

Week 4 ends with a 7-day break — that's the full week off that defines the DuPont pattern. Over 28 days, a single crew works approximately 168 hours, which averages to 42 hours per week. But as with the Pitman schedule, averages conceal significant week-to-week variation that directly affects your overtime.

The shift switch: DuPont crews rotate between day shifts (often 6 AM–6 PM) and night shifts (6 PM–6 AM) within the 28-day cycle. This shift inversion — from days to nights mid-rotation — is the most physically demanding aspect of DuPont compared to schedules that stay on one shift type. The one-week break at the end of the cycle is partly designed to allow recovery from the day-to-night transition.

FLSA overtime week by week

The DuPont schedule's heavy variation across weeks makes the overtime calculation non-obvious. Here's what each of the four weeks looks like through the FLSA lens:

WeekShiftsTotal HoursStraight-Time HoursOT Hours
Week 1 (4 days)4 × 12 hrs48 hrs40 hrs8 hrs @ 1.5×
Week 2 (6 days)6 × 12 hrs72 hrs40 hrs32 hrs @ 1.5×
Week 3 (4 nights)4 × 12 hrs48 hrs40 hrs8 hrs @ 1.5×
Week 4 (3 nights + off)3 × 12 hrs36 hrs36 hrs0

Week 2 is the heavy week — six consecutive 12-hour shifts generates 32 hours of overtime in a single FLSA workweek. Over the full 28-day cycle, you earn 48 hours of overtime pay (8 + 32 + 8 + 0). That premium is significant.

Who uses the DuPont schedule

The DuPont pattern works for any 24/7 continuous process operation with four-crew staffing. Most common industries:

DuPont is less common in healthcare, public safety, and retail, where Pitman 2-2-3, 3×12, or 4-on-4-off schedules tend to dominate. The day-to-night rotation of DuPont is particularly well-suited to industrial environments where all workers on a shift need to be doing the same type of work, regardless of whether it's day or night.

Real pay example: $32/hr utility worker on DuPont

28-Day DuPont Cycle — $32/hr, No Differential
Regular rate$32.00/hr
Week 1: 8 OT hrs × $48.00$1,536 + $384 OT = $1,920
Week 2: 32 OT hrs × $48.00$1,280 + $1,536 OT = $2,816
Week 3: 8 OT hrs × $48.00$1,536 + $384 OT = $1,920
Week 4: 36 hrs straight time$1,152
Total gross for 28-day cycle$7,808.00
Annualized (13 cycles/year)~$101,504/year gross

The $101,504 gross figure is notably higher than a straight-time 42-hour average would produce: 42 hrs × $32 × 52 weeks = $69,888. The overtime premium from DuPont's heavy weeks adds over $31,000 in annual gross earnings at $32/hr — a 45% uplift over a simple hours-times-rate calculation. This is why DuPont workers often earn significantly more than their posted hourly rate suggests.

Night shift differential impact

Add a $3.00/hr night differential for Weeks 3 and 4 (the night rotation) and the picture improves further. Night differential must be included in the regular rate, so it also increases the overtime rate for those specific hours.

Night Differential Impact (Weeks 3 & 4 only)
Night rate (base + differential)$35.00/hr
Week 3 OT rate (1.5 × $35)$52.50/hr
Additional earnings vs. no differential+~$1,020 per cycle
Annual differential uplift~+$13,260/year

Run your full DuPont pay calculation — base rate, night differentials, and week-by-week overtime broken down automatically.

Try the DuPont Pay Calculator →

Frequently Asked Questions

How many hours per year does a DuPont schedule produce?
Approximately 2,184 hours per year — 168 hours per 28-day cycle × 13 cycles. This is meaningfully less than a 24/48 firefighter schedule (2,920 hours) but more than a standard 40-hour/52-week job (2,080 hours). The key difference is that DuPont's hours cluster unevenly, with one heavy week per cycle generating substantial overtime.
What's the difference between DuPont and Pitman schedules?
Pitman (2-2-3) uses a 14-day cycle with two crews sharing a shift type, averages 42 hours a week, and alternates between a 60-hour week and a 24-hour week. DuPont uses a 28-day cycle with four crews, includes a shift-type rotation from days to nights, and delivers one full week off every four weeks — something Pitman doesn't offer. DuPont's week 2 is heavier (72 hours, 32 hours of overtime) than any week in a Pitman rotation. For a direct pay comparison, see our Pitman guide.
Can employers avoid paying DuPont overtime by averaging hours?
No. FLSA overtime is calculated on a fixed 7-day workweek — not averaged across the 28-day cycle. Employers cannot lawfully average your DuPont hours across 28 days to reduce overtime obligations. Each workweek stands alone. If your employer calculates your 28-day cycle pay as 168 hours × straight time without adding overtime premiums for the heavy weeks, they are likely underpaying you under FLSA.
Is the one week off in DuPont paid or unpaid?
That depends entirely on your employer's policy and any applicable collective bargaining agreement — not on federal law. FLSA only requires pay for hours actually worked. Some employers pay a fixed salary that spreads earnings across the full 28-day cycle including the off-week; others pay only for hours worked. Check your employment contract or union agreement to determine how your off-week is treated.
How hard is the day-to-night rotation on DuPont?
The shift inversion in weeks 3–4 is consistently cited by DuPont workers as the hardest adjustment in the rotation. Moving from day shifts to night shifts within the same cycle disrupts circadian rhythm. The 7-day off period at the end of the cycle helps, but most workers report it takes 3–5 days to fully adjust sleep schedules after each switch. Workers who can control their sleep environment and light exposure tend to adapt better.
Disclaimer: The information provided on ShiftRosterPay is for informational and educational purposes only and does not constitute formal legal, financial, or payroll advice. Labor laws (including FLSA and state-specific statutes) are subject to change and vary by jurisdiction, industry, and collective bargaining agreements. Always consult with a qualified employment attorney or your HR department regarding specific wage, hour, and shift differential issues.