Three rotating schedules dominate the 24/7 industrial and healthcare workforce in the US: the Pitman 2-2-3, the DuPont 12-hour rotation, and the 4-on-4-off. All three run 12-hour shifts. All three average around 42 hours per week over their full cycle. And all three generate FLSA overtime — but in very different amounts, at very different times.

If you're choosing between two job offers on different schedules at the same hourly rate, or if your facility is switching patterns and you want to know what happens to your paycheck, this guide runs the full numbers side by side. Same $30.00/hr base rate. Same FLSA rules. Same year. Three different answers.

The quick summary: annual earnings at $30/hr

Pitman 2-2-3
$68,640-$73,320
Annual gross at $30/hr
42 hrs avg/week · 8 to 20 OT hrs per cycle · 26 cycles/year
DuPont 12-hr
$68,640-$74,880
Annual gross at $30/hr
42 hrs avg/week · 16 to 48 OT hrs per cycle · 13 cycles/year
4-on-4-off
$68,640
Annual gross at $30/hr
42 hrs avg/week · 208 OT hrs/year · ~182 shifts/year

All three schedules average the same hours — approximately 42 per week or 2,184 per year. The earnings difference comes entirely from when those hours fall relative to the 40-hour FLSA workweek threshold. DuPont's compressed week-2 structure (six consecutive 12-hour shifts) can stack more overtime hours into fewer weeks. Whether it does depends on how your employer's Sunday-to-Saturday workweek lines up with your crew's cycle: DuPont ranges from 208 to 624 overtime hours a year, Pitman from 208 to 520, and 4-on-4-off is always 208.

Schedule 1: Pitman 2-2-3 — how overtime works

The Pitman schedule repeats every 14 days. Each crew works a 2-2-3 pattern of 12-hour shifts with corresponding off days. The critical feature for pay: one week in the cycle is heavy (60 hours) and the next is light (24 hours).

Pitman WeekShiftsTotal HoursOT HoursOT Pay
Long week (5 shifts)5 × 12 hrs60 hrs20 hrs @ 1.5×$900.00
Short week (2 shifts)2 × 12 hrs24 hrs0$0
Per 14-day cycle total7 shifts84 hrs20 hrs$900.00
Pitman Annual Pay — $30/hr
Cycles per year (52 weeks ÷ 2)26 cycles
Straight-time hours (84 – 20 OT × 26)1,664 hrs × $30 = $49,920
Overtime hours (20 × 26)520 hrs × $45 = $23,400
Annual gross$73,320
vs. flat 2,184 hrs at straight time$65,520
Overtime premium value (heavy-week alignment; +$3,120 in the other alignments)+$7,800/year

Schedule 2: DuPont 12-hour — how overtime works

DuPont runs a 28-day cycle with four distinct weeks. The important difference from Pitman is Week 2: six consecutive 12-hour shifts in a single FLSA workweek. This one week alone generates 32 hours of overtime. Combined with 8 OT hours in each of Week 1 and Week 3, the total is 48 overtime hours per cycle — more than double Pitman's 20.

DuPont WeekShiftsTotal HoursOT HoursOT Pay
Week 14 × 12 hrs48 hrs8 hrs @ 1.5×$360.00
Week 26 × 12 hrs72 hrs32 hrs @ 1.5×$1,440.00
Week 34 × 12 hrs48 hrs8 hrs @ 1.5×$360.00
Week 4 (rest week)00 hrs0$0
Per 28-day cycle total14 shifts168 hrs48 hrs$2,160.00
DuPont Annual Pay — $30/hr
Cycles per year (364 days ÷ 28)13 cycles
Straight-time hours (120 hrs × 13)1,560 hrs × $30 = $46,800
Overtime hours (48 × 13)624 hrs × $45 = $28,080
Annual gross$74,880
vs. flat 2,184 hrs at straight time$65,520
Overtime premium value (best alignment; +$3,120 in the worst)+$9,360/year

Schedule 3: 4-on-4-off — how overtime works

The 4-on-4-off schedule is exactly what it sounds like — four 12-hour shifts on, four days off, repeating indefinitely. Unlike Pitman and DuPont, this schedule doesn't have a fixed number-of-weeks cycle that aligns neatly with FLSA 7-day workweeks. The pattern drifts relative to the fixed workweek start day, creating a mix of 48-hour and 36-hour FLSA workweeks depending on how the 8-day pattern aligns at any given moment.

The 4-on-4-off overtime reality: the 8-day pattern drifts against the 7-day workweek and repeats every 56 days. In half of all workweeks you work 4 shifts (48 hours, 8 overtime hours); in the other half 3 shifts (36 hours, no overtime). The weeks do not strictly alternate, but the average is 4 overtime hours per week, 208 a year, whatever day your workweek starts.

4-on-4-off Annual Pay — $30/hr
Total annual hours (4 on/4 off = 50% on)~2,184 hrs
8-day cycles per year~45.6
OT hours per workweek (average)4 hrs (8 hrs in half of all weeks)
Total OT hours per year208 hrs
Straight-time earnings1,976 hrs × $30 = $59,280
Overtime earnings208 hrs × $45 = $9,360
Annual gross$68,640
Overtime premium value+$3,120/year

The verdict: side-by-side comparison

ScheduleAnnual HoursOT Hours/YearAnnual Gross ($30/hr)OT Premium
Pitman 2-2-32,184 hrs208-520 hrs$68,640-$73,320+$3,120-$7,800
DuPont 12-hr2,184 hrs208-624 hrs$68,640-$74,880+$3,120-$9,360
4-on-4-off2,184 hrs208 hrs$68,640+$3,120

DuPont can pay the most, but only in its best workweek alignment. At $30/hr with no differentials and 52 workweeks, DuPont's best case ($74,880) beats Pitman's best case ($73,320) by $1,560 and 4-on-4-off ($68,640) by $6,240. In DuPont's worst alignment all three pay the same $68,640. Ask payroll which day your workweek starts: it matters more than the schedule name. The DuPont alignment table shows every case.

But pay isn't the only variable. Here's how the three schedules compare on lifestyle factors:

FactorPitmanDuPont4-on-4-off
Max consecutive days off3 days7 days (once/cycle)4 days
Max consecutive days worked5 days6 days (Week 2)4 days
Shift type rotationStays on one shiftRotates days/nightsCan stay one shift
Schedule predictabilityHigh (14-day repeat)High (28-day repeat)High (8-day repeat)
Cycle length14 days28 days8 days

If maximizing gross pay is the priority, find out which workweek alignment your employer uses before you pick a schedule. If minimizing consecutive days worked matters more, or day/night rotation is hard for you, 4-on-4-off offers the gentlest schedule at the same base pay.

Plug in your actual hourly rate and see the full pay breakdown for any of these three schedules — with night differentials and real overtime calculated week by week.

Try the Free Shift Pay Calculator →

Frequently Asked Questions

Do all three schedules really work out to the same annual hours?
Approximately, yes. Pitman averages 42 hrs/week (84 hrs/14 days). DuPont averages 42 hrs/week (168 hrs/28 days). 4-on-4-off averages 42 hrs/week (48 hrs/8 days, half the time). Real-world variations — holidays, sick days, call-ins — will shift these figures slightly, but the annual hours are structurally identical across all three. The earnings difference is purely a function of how overtime laws interact with the distribution of those hours across FLSA workweeks.
Can employers put workers on DuPont and pay straight time for all hours to avoid the overtime premium?
No. For non-exempt employees, FLSA overtime is mandatory. Employers cannot average DuPont hours across the 28-day cycle to reduce overtime. Each 7-day workweek stands alone. In the best alignment, Week 2's 72-hour workweek generates 32 mandatory overtime hours at 1.5×, regardless of how the employer structures the pay cycle or how the schedule is marketed to workers.
Does the shift type (day vs. night) change which schedule pays more?
A night differential adds the same dollars per night hour on any schedule, so it does not change how the schedules compare on overtime. It does change your total: a DuPont crew works about 84 night hours per 28-day cycle, and a fixed-night Pitman or 4-on-4-off crew works more. Enter your own differential in the calculator to see the exact result.
Which schedule is best for a second job?
The 4-on-4-off gives the most predictable, recurring off-days — four consecutive days off every eight days — making secondary employment planning easiest. Pitman's alternating short/long cycle gives you a reliable 3-day break every two weeks. DuPont's full week off is the longest single break, but the heavy Week 2 (six consecutive 12-hr shifts) leaves limited energy for secondary work immediately before or after.
Disclaimer: The information provided on ShiftRosterPay is for informational and educational purposes only and does not constitute formal legal, financial, or payroll advice. Labor laws (including FLSA and state-specific statutes) are subject to change and vary by jurisdiction, industry, and collective bargaining agreements. Always consult with a qualified employment attorney or your HR department regarding specific wage, hour, and shift differential issues.